Ionic Capitals and Bases Ready to Install

Really excited to the first delivery of stone carved by the great people at Monumental Labs.   Full limestone capitals and bases for the main columns on the façade of the Library are ready to go in, and other small details and the St. Benedict Medallions for the St. Benedict Hall Entry project.

Erik Bootsma Architect PLLC makes no claim to exclusive authorship of this project and acknowledges this project is a joint creation by Ellison-Auxier Architects, James McCrery Architects and Erik Bootsma Architect PLLC.  Each party retains responsibility and credit for their own contributions to the project.  This collaboration does not constitute a partnership or joint venture.

Project Collaborators and Roles

Ellison-Auxier Architects – Architect of Record

James McCrery Architect – Design Architect

Erik Bootsma Architect PLLC – Design Consultant and partial Design Architect

Share the Post:

Related Posts