Benedictine Library Tower Progress

Tower Columns installed and Clock Faces Coming

Construction continues apace at Benedictine College and the library tower is taking shape. Columns are in place and ready to be finished out. The exterior brick is nearly finished and the tower is ready for the columns to be installed this next month. The interior of the library reading room, assembly room and multipurpose room are taking shape with trim being installed.

Erik Bootsma Architect PLLC makes no claim to exclusive authorship of this project and acknowledges this project is a joint creation by Ellison-Auxier Architects, James McCrery Architects and Erik Bootsma Architect PLLC.  Each party retains responsibility and credit for their own contributions to the project.  This collaboration does not constitute a partnership or joint venture.

Project Collaborators and Roles

Ellison-Auxier Architects – Architect of Record

James McCrery Architect – Design Architect

Erik Bootsma Architect PLLC – Design Consultant and partial Design Architect

Share the Post:

Related Posts